Featured Post

Step Wise Project Planning

Planning is the most difficult process in project management. The framework described is called the Stepwise method to help to distinguis...

Spiral Model

    The problem with traditional software process model is that they do not deal sufficiently with the uncertainity which is inherent to the software projects.Each loop of the spiral represents a phase of software process.Each phase in this model is split into four sector or quadrant.







  • 1) Identification:This phase starts with gathering the business requirements in the baseline spiral. In the subsequent spirals as the product matures, identification of system requirements, subsystem requirements and unit requirements are all done in this phase.
    This also includes understanding the system requirements by continuous communication between the customer and the system analyst. At the end of the spiral the product is deployed in the identified market.
  • 2) Design:Design phase starts with the conceptual design in the baseline spiral and involves architectural design, logical design of modules, physical product design and final design in the subsequent spirals.
  • 3) Construct or Build:Construct phase refers to production of the actual software product at every spiral. In the baseline spiral when the product is just thought of and the design is being developed a POC (Proof of Concept) is developed in this phase to get customer feedback.
    Then in the subsequent spirals with higher clarity on requirements and design details a working model of the software called build is produced with a version number. These builds are sent to customer for feedback.
  • 4) Evaluation and Risk Analysis:Risk Analysis includes identifying, estimating, and monitoring technical feasibility and management risks, such as schedule slippage and cost overrun. After testing the build, at the end of first iteration, the customer evaluates the software and provides feedback.
Previous
Next Post »